Couple of issues
Posted: Tue Nov 13, 2012 7:53 pm
Issue 1--I've reviewed some plans for two construction staking commercial projects and the plans include ALTA surveys on both. The ALTA surveys appears to satisfy the ALTA requirements. My issue is that both of these properties are not shown on a recorded survey map and thus a record of survey maps should have been filed. I checked with the County Surveyor and there is nothing that has been submitted. The field survey dates on these were in Feb., 2012. I sent an e-mail to the surveying/engineering firm inquiring if an ROS was to be prepared and submitted. I have not received a response. I'm not expecting one at this point. Also the ALTA surveys only show a couple of found monuments and do not show any mons. being set nor how the boundary was determined. This makes things difficult as far as estimating, because I'm going to have to include an ROS in the bid. My hunch is the same engineering firm is probably submitting a bid also and thus has an advantage with the control. Is there any recourse with this kind of issue besides submitting a complaint with the Board?
Issue 2-This is one is fairly minor. I was asked to provide an estimate to determine the lot area of two subdivision lots. This is a requirement by the planning department as part of a submittal. I have not conducted any survey work on this property. My question is "What do others on the Board think about submitting calculations based upon record data rather than determining the area from a survey?" I asked this question of the planning dept. and they said it was up to the discretion of the surveyor. Obviously, a field survey would be much more costly. I don't think one is necessary as long as setbacks aren't being verified or the location of features on the property don't need to be shown in relation to the prop. lines. Comments??
Issue 2-This is one is fairly minor. I was asked to provide an estimate to determine the lot area of two subdivision lots. This is a requirement by the planning department as part of a submittal. I have not conducted any survey work on this property. My question is "What do others on the Board think about submitting calculations based upon record data rather than determining the area from a survey?" I asked this question of the planning dept. and they said it was up to the discretion of the surveyor. Obviously, a field survey would be much more costly. I don't think one is necessary as long as setbacks aren't being verified or the location of features on the property don't need to be shown in relation to the prop. lines. Comments??