Another newbie surveyor
Posted: Tue Aug 05, 2014 11:19 am
It takes a few years to understand what surveying is really all about. For many, it's a mathematical adventure.
The 1st picture the CR surveyor calls an 'Original Corner Monument' off.
The 2nd picture calls a c/l PRC off by 0.012'. Now, back when these L/T points were set, prior to 1935, the city was, at times, using a nail (or tack if you prefer) that was about 0.01' in diameter in the leads. Other nails were maybe less than a 1/16th of an inch.
The 1st picture the CR surveyor calls an 'Original Corner Monument' off.
The 2nd picture calls a c/l PRC off by 0.012'. Now, back when these L/T points were set, prior to 1935, the city was, at times, using a nail (or tack if you prefer) that was about 0.01' in diameter in the leads. Other nails were maybe less than a 1/16th of an inch.