Angle point to be set...

Post Reply
User avatar
pls7809
Posts: 1035
Joined: Tue Apr 13, 2004 3:48 pm
Location: Chino, CA

Angle point to be set...

Post by pls7809 »

I have a survey I'm working on where the PL is in the middle of a slope and an angle point of the PL, where I could not find anything, falls on a stump. What are your thoughts on what type of monument to set here? My first thought is Nail & Tag. This is in Orange County. Need opinions/suggestions if Nail and tag is not the way to go.

Thanks.
User avatar
PLS7393
Posts: 949
Joined: Tue Aug 24, 2004 2:09 pm
Location: Bay Area (Fremont)
Contact:

Post by PLS7393 »

Why not set a standard (approved) monument on an offset? Very simple and when documented, any surveyor will find the reference (R.O.S. or Corner Record).
Keith Nofield, Professional Land Surveying
PLS 7393
bruce hall
Posts: 645
Joined: Sun Oct 05, 2003 9:18 pm
Location: huntington beach, orange county, california

Offset it like Keith

Post by bruce hall »

said. You could also go 5 feet( or whatever) along the line both ways from the angle point and set a monument. Both lines would be monumented with a reference to the angle point. This may not work because of other obstructions, but it is a thought.

Although a mag spike and washer or gear head and washer at the angle point in the stump is not a bad idea either.
Bruce Hall Land Surveyor No. 4743
5732 Middlecoff Drive
Huntington Beach, Ca. 92649
714 840 4380
7702
Posts: 392
Joined: Mon Jan 10, 2005 6:57 pm

Post by 7702 »

If the stump is solid, I would set a marker at the angle point AND something hopefully more permanent for line points.
Mark Moore, LS 7702
E_Page
Posts: 2144
Joined: Thu Jun 23, 2005 6:49 am
Location: El Dorado County

Post by E_Page »

I typically will set an offset equidistant down each line from the corner.
Evan Page, PLS
A Visiting Forum Essayist
User avatar
pls7809
Posts: 1035
Joined: Tue Apr 13, 2004 3:48 pm
Location: Chino, CA

Post by pls7809 »

That was my second thought. I'll probably set three points. Pipes down each line 10' or so and then a spike with washer in the stump.
7702
Posts: 392
Joined: Mon Jan 10, 2005 6:57 pm

Post by 7702 »

If the stump isn't too solid, you might be able to drive a sharpened rebar at the corner location. If the stump is too hard to do that, then there's a good chance that a spike will remain for quite a few years (depending on the species of tree and humidity, etc.)
Mark Moore, LS 7702
Post Reply