R/S Question

Post Reply
User avatar
Dave Karoly, PLS
Posts: 670
Joined: Fri Aug 30, 2002 6:26 pm
Location: Sacramento

R/S Question

Post by Dave Karoly, PLS »

I'm putting together a filing package on an R/S...

I need to set one monument. I haven't set it yet. The preliminary copy of the map shows it as set although it isn't yet. I will set it before delivering the final Mylar map. I will notify the County Surveyor that it isn't set yet in the transmittal letter.

I've always set the monuments first then filed in the past but I want to get the ball rolling on this one.

That shouldn't be a problem, right?
"Gee, I wish we had one of them doomsday machines." -General "Buck" Turgidson
D Ryan
Posts: 190
Joined: Fri Aug 23, 2002 12:20 pm
Location: Arcata, CA

Post by D Ryan »

Dave-

You'll be stamping preliminary on your submittal, right? You may be overthinking this (or just being conscientious), but you'll have an opportunity to update your description of the the character of the monument, if necessary before you submit mylar. I don't see it as big deal, and surmise it happens all the time in the interest of keeping different surveying tasks going concurrently.

Dave Ryan,
Humboldy County
LA Stevens
Posts: 290
Joined: Mon Dec 03, 2007 11:03 am
Location: Marin County, California
Contact:

Post by LA Stevens »

I wouldn't show the monument on the preliminary survey, but you could tell the checker that you will be setting the appropriate monument at that corner and showing on your future mylar submittal. If they want to see it prior, tell them you will send them a pdf prior to making the mylar.
Larry

Lawrence A. Stevens, PLS
L.A. Stevens & Associates, Inc.
Professional Land Surveyors
7 Commercial Blvd., Suite One
Novato, CA 94949
P 415-382-7713

http://www.LAStevensInc.com
http://www.LSACTS.com
User avatar
JMS8070
Posts: 68
Joined: Wed Mar 11, 2009 3:34 pm
Location: Brea, CA

Post by JMS8070 »

I feel you are fine as is. We do that very thing often because we like having one more set of eyes check our boundary before putting a monument in the ground.

Once that first check happens and they have no issues with your boundary, set the monument and update the character on the map.

All good.
J. Marty Smith
PLS 8070
User avatar
LS_8750
Posts: 1166
Joined: Tue Jul 20, 2010 5:36 pm
Location: Sonoma
Contact:

Post by LS_8750 »

I've seen several maps were monuments were called for on the map, but never set. I'm not a fan.
Clark E. Stoner, PE, PLS
Bear Flag Engineering, Inc.
Sonoma County
Santa Cruz County
tel. 707.996.8449 (Sonoma) or 831.477.9215 (Santa Cruz)
clark@bearflagcivil.com
LA Stevens
Posts: 290
Joined: Mon Dec 03, 2007 11:03 am
Location: Marin County, California
Contact:

Post by LA Stevens »

If someone else is working in the area and the County Surveyor gives them your prelim copy, they could be looking for a monument that doesn't exist yet. That is a pain for people.
Larry

Lawrence A. Stevens, PLS
L.A. Stevens & Associates, Inc.
Professional Land Surveyors
7 Commercial Blvd., Suite One
Novato, CA 94949
P 415-382-7713

http://www.LAStevensInc.com
http://www.LSACTS.com
bruce hall
Posts: 645
Joined: Sun Oct 05, 2003 9:18 pm
Location: huntington beach, orange county, california

I normally set the monuments

Post by bruce hall »

prior to filing the map, but that's usually because I get my money when the pipes/tags are in the ground.

But, there is nothing wrong with showing on your submittal what you are going to set. Just be sure that when you send in the mylars that the monument is in fact set. And I would think you could do that.

What you plan on doing sounds okay to me. No problem.
Bruce Hall Land Surveyor No. 4743
5732 Middlecoff Drive
Huntington Beach, Ca. 92649
714 840 4380
User avatar
Jim Frame
Posts: 1599
Joined: Thu Oct 17, 2002 8:52 pm
Location: Davis, CA
Contact:

Post by Jim Frame »

Same here. As long as I'm confident about the location and character of the monument to be set, I show it on the draft submittal.
Jim Frame
Frame Surveying & Mapping
609 A Street
Davis, CA 95616
framesurveying.com
surveysays
Posts: 29
Joined: Fri Jun 17, 2011 10:53 am
Location: Ventura County

After the fact

Post by surveysays »

Here in Ventura County it's not an uncommon practice in my experience to set the monuments after the R/S is recorded. I like the idea of setting them before, so at the very least the description will be accurate. Regrettably that has not been the norm here.
pbchief2
Posts: 60
Joined: Fri Jan 19, 2007 8:30 pm
Location: Sacramento, CA

Post by pbchief2 »

Please set the monuments. I had bad luck with a few "set" monuments in the last few weeks. Filing dates in 2006, 2009 and 2013. The calls included lead and tacks, Wells, #4 rebar, IP's, and spike and washers. NONE SET!!!
LSIT
User avatar
Dave Karoly, PLS
Posts: 670
Joined: Fri Aug 30, 2002 6:26 pm
Location: Sacramento

Post by Dave Karoly, PLS »

This is the first time I filed an R/S or Corner Record without setting the monuments first. Usually it's the other way around, I'm trying to catch up on the mapping.
"Gee, I wish we had one of them doomsday machines." -General "Buck" Turgidson
Post Reply