Today I did a simple layout - flat lot. Anyway, the concrete guys crew had been hanging around waiting on us so they could start trenching, I hate trade waiting on another trade to finish so they could start.
Eventually, hours later, the guy who owns the company shows up and he waits with his crew.
Everyone was cool, but I don't need distractions when doing layout. AS far as I was concerned, they could start tomorrow if that's how it went.
We finished around 1 PM and I told them they could start batter boarding away if they want. Man, 6 guys really got busy, real fast.
Someone set a laser level up and forms started growing out of the ground.
I asked the contractor what he used for a site bench, He shows me a copy of my survey with an offset lead/tag note colored in bright pink. But there was no elevation associated with it.. Just above the monument note was a simple spot elevation, which this guy used to grade the site. Now his subgrade is 5 inches high. He used an elev of 33.87, BW grade near the tag is 33.46. I have attached a pdf of the mess.
PS He also was the grading contractor
CONTRACTORS BENCH MARK
-
LS 4722
- Posts: 479
- Joined: Wed Aug 15, 2007 8:42 am
CONTRACTORS BENCH MARK
You do not have the required permissions to view the files attached to this post.
-
T. S. Higgins
- Posts: 116
- Joined: Mon Jun 01, 2009 12:08 pm
I'm used to seeing the same. Not that it was right for the contractor to assume, and he certainly should have checked the back of walk elevation before grading the site.dedkad wrote:I don't think I've ever seen a spot elevation just floating somewhere. Usually the "spot" where the elevation was taken is denoted by a leader line or an X.
Tristan S. Higgins, PLS
- Steve Martin
- Posts: 632
- Joined: Mon Apr 04, 2005 12:24 pm
- Location: Hayward
Decimal point elevation
Some very old topo maps used the decimal point in the elevation as the marker for where the elevation indicated was taken.
Steve Martin, LS 7264
-
bruce hall
- Posts: 645
- Joined: Sun Oct 05, 2003 9:18 pm
- Location: huntington beach, orange county, california
I like the way
Paul showed it. Nothing "unusual" in how he labeled-marked the existing ground.
one thing for certain, the back of walk wouldn't have been 0.4' higher than his tag. Now that would have been unusual.
I like his note as well. All one has to do is get someone to read it.
one thing for certain, the back of walk wouldn't have been 0.4' higher than his tag. Now that would have been unusual.
I like his note as well. All one has to do is get someone to read it.
Bruce Hall Land Surveyor No. 4743
5732 Middlecoff Drive
Huntington Beach, Ca. 92649
714 840 4380
5732 Middlecoff Drive
Huntington Beach, Ca. 92649
714 840 4380
- land butcher
- Posts: 1615
- Joined: Fri Jul 26, 2002 7:26 pm
- Location: calif
That's contractors, find one point and run with it.
And rotating laser levels are perfect, never need adjusting.
And rotating laser levels are perfect, never need adjusting.
Defund govt
To fully fund govt first the national debt would have to be paid. The US Govt is $18 TRILLION in debt, using 350 million people in the USA it would require $51,000 from every man, woman and child to pay it off. And that's just the Federal debt. Did you write your check yet?
To fully fund govt first the national debt would have to be paid. The US Govt is $18 TRILLION in debt, using 350 million people in the USA it would require $51,000 from every man, woman and child to pay it off. And that's just the Federal debt. Did you write your check yet?