Title: Survey Party Chief
Department(s): Operations- Field & Office
Reports to: Survey Department Chief
Full Time Salary position - 40 hours/wk Field
Salary -- commensurate with experience - $70,000+ - + BENEFITS
KAPPA Surveying & Engineering
619-465-8948
Job Summary
A Survey Party Chief is required to demonstrate a thorough knowledge of survey computations, types of surveys and field operations. The individual in this position is well versed with field note reduction and in depth plan interpretation and preparation. The Party Chief has knowledge of the principles of the profession and various technical standards. Work elements further describe the requirements related to this position.
The candidate must know construction staking, boundary, topo, ALTA and GPS experience is required.
The individual will be expected to work in the office during days and times that no field work is scheduled. The office work will include, but not limited to, support of the Survey Manager and production of ALTAs, Topography's, Record of Surveys, Construction Calculations, etc. . .
Summary of Essential Job Function
1) Types of Surveys
a) Know the principles and methods used in performing a variety of types of surveys such as: photo control surveys, state plane coordinate surveys, public land surveys, metes and bounds surveys, GPS surveys, construction surveys, and as-built surveys.
2) Field Equipment & Instruments
a) Extensive knowledge of proper field procedures
b) Knowledge of the care, cleaning, and use of a variety of surveying tools and equipment, including field radios.
c) Know how to operate, check, and perform basic field adjustments on rods, compass, transits, levels, tribrachs, theodolites, total stations, robotic total stations, data collectors, tripods, and GPS equipment. Some historical knowledge is required.
3) Survey Computations
a) Have basic knowledge of trigonometry, geometry and algebra as related to traverse, inverse and intersection computations.
b) Be capable of performing horizontal and vertical traverse adjustments, area and quantity computations, and horizontal and vertical curve computations.
4) Control Points: Horizontal & Vertical
a) Know when to use, how to obtain, and how to interpret control point records and data sheets, as well as locate points in the field. Be capable of being creative when strategizing initial setups for a project.
5) Field Operations
a) Have knowledge of a wide variety of surveying field operation methods including but not limited to: traversing; triangulation; trilateration; repeating observations and precision measurements using steel tapes and theodolites; construction layout methods and procedures.
b) Know procedures for GPS surveys.
6) Field Notes
a) Know how to create, reduce, and check orderly field notes for standard surveying operations such as but not limited to: leveling, traversing, topographic mapping, construction layout, as-built surveys, boundary surveys, profile and cross section surveys.
7) Plan Reading & Preparation
a) Have knowledge and understanding of plan reading and preparation (i.e. site plans, boundary plans, highway plans, profiles and cross sections, horizontal and vertical curves, pipeline plans, foundation plans, and developing existing and finished contours).
8) First Aid & Safety
a) Basic knowledge of treatment practices for a variety of medical emergencies. Have a general knowledge of traffic control and safety procedures for surveying and construction operations including Occupational Safety and Health Administration (OSHA) standards.
9) Principles of the Profession
a) Have knowledge of ethics and the various technical standards of groups such as ALTA, NGS, NSPS, ACSM, BLM, and ASCE.
b) Show responsibility in the profession (i.e. attire, honesty, respect for personal property) and awareness of related professional associations.
10) Supervisory Skills
a) Have a basic knowledge and skills with: client contacts, dealing with the public and governmental agencies, field crew management, equipment and supplies management.
b) Have knowledge of proper record keeping, time keeping, and job charges.
d) Be able to coordinate and supervise field work, staking and stake marking for a variety of standard types of surveys.
To Apply:
KAPPAinc.com Info@KAPPAinc.com
Survey Party Chief - San Diego - Lets Get To Work !!!
-
Rick T
- Posts: 6
- Joined: Wed Mar 03, 2010 4:13 pm
- Location: San Diego