The FEMA instruction diagrams are a little confusing here. Is elevation C2A supposed to be the finish floor elevation for a one story slab on grade building? I think so, but I want to confirm with others. Thanks.

So I would assume then that elevation for C2(b) is N/A? Correct?
User avatar
sako
Posts: 323
Joined: Sat Sep 24, 2005 9:40 am
Location: Bay Area

Post by sako »

The FF elevation goes to C2a, and yes, I add N/A to C2b.