Benefits of continuity of the same Surveyor from start to finish

Post Reply
KrisAchee
Posts: 1
Joined: Thu Feb 16, 2023 10:35 am

Benefits of continuity of the same Surveyor from start to finish

Post by KrisAchee »

Good morning! Does anyone have something in writing about the benefits of continuity of using the same Surveyor from start to finish? Starting with initial control and topo for design through construction staking.
User avatar
Steve Martin
Posts: 630
Joined: Mon Apr 04, 2005 12:24 pm
Location: Hayward

Re: Benefits of continuity of the same Surveyor from start to finish

Post by Steve Martin »

No specifically, but sometimes you are handed a CAD topo file from the design engineer, only to find that control points have been removed from the file, or it was converted from AutoCAD to Microstation using the wrong foot definition.

I finally got the engineers to send the CAD files over before they went to town on them, so we could see if there was enough information to be able to stake the project. Often this involved calling the preliminary surveyor to get control information.
CBarrett
Posts: 758
Joined: Thu Dec 16, 2021 12:55 pm

Re: Benefits of continuity of the same Surveyor from start to finish

Post by CBarrett »

Different approaches all have their pluses and minuses.
What it is that you are trying to solve or address?
Post Reply